HomeServicesBarn Demolition › Tully, NY

Barn Demolition in Tully, NY

Stone foundation, hayloft, post-and-beam, or modern pole barn. Onondaga contractor.

5.0 Stars
117 Reviews Total
OSHA 30
Construction Safety
NYS DOL
Asbestos Licensed
NYS DOL
Public Work Registered
SAM Registered
Federal Contractor
NYSDEC SWPPP
GP-0-20-001 Compliant

Barn Demolition in Tully

$4,000
to
$18,000
$4K - $7KSmall barn or large shed, no foundation
$6K - $10KStandard barn, dirt or partial foundation
$9K - $14KLarge dairy / horse barn
$12K - $18KStone foundation + full removal & backfill
+$500 - $2KAsbestos or lead paint abatement

Real reply in hours, not days.

What Backwell Handles in Tully

Barns in Tully, NY are not standardized structures. Stone foundations, post-and-beam frames, dirt floors, and decades of repairs make each one a custom job.

Related

Get my exact price ›

Get a free written estimate

Tell us the basics. Real reply in hours, not days.

Barn Demolition in Nearby Areas

Geography & Site Conditions in Tully, NY (Onondaga County)

Tully occupies the Appalachian Plateau in southern Onondaga County, on the headwaters divide between the Atlantic and Great Lakes drainages. Soils across the village and surrounding commercial parcels are dominated by Mardin and Langford channery silt loams on the rolling uplands, with Lordstown channery silt loam on the highest ground and Palmyra gravelly loam on the outwash in the Tully valley itself.

The Tully Valley is one of the most distinctive hydrogeologic settings in Central New York, with Onondaga Creek draining north toward Syracuse, the Tioughnioga headwaters draining south, and the historic Tully Valley mudboil and landslide activity adding karst and slope-stability considerations to any earthwork on the valley walls. Commercial site work in Tully regularly involves shallow sandstone and siltstone bedrock on the plateau parcels, fragipan-restricted drainage on the uplands, and stormwater design that accounts for the Onondaga Creek watershed's contribution to Onondaga Lake. Frost depth is substantial. Projects in the valley floor routinely require coordination with NYSDEC on Onondaga Creek stream-protection permitting, and subsurface investigation is standard before slab or foundation work.